Mold Removal Plus 772-GOT-MOLD

Home › Interior Demolition & Cleanouts

Interior Demolition & Cleanouts

Gut-outs, tear-outs, debris removal, and cleanouts — demo and haul by the same crew that rebuilds.

5.0 on Google · 7 reviews Leave us a review
★ 5.0 on Google · 7 reviews· Mold Assessor MRSA4171· Mold Remediator MRSR4242· Building Contractor CBC1262255· AC Contractor CAC1822191· Licensed & Insured — Open 24 Hours

Interior demolition is the unglamorous first half of almost every mold and remodel job: the damaged bathroom, kitchen, drywall, and flooring have to come out before anything can be rebuilt. We demo and haul it ourselves — bathroom and kitchen gut-outs, interior demolition for remediation and remodels, debris removal, and property cleanouts — so the tear-out, the mold work, and the rebuild stay with one company and one schedule.

What we take out

  • Bathroom gut-outs — tile, tubs, vanities, rotted subfloors
  • Kitchen gut-outs — cabinets, counters, damaged flooring
  • Drywall and flooring tear-out after water damage
  • Debris removal — we haul it ourselves, dumpster on site
  • Property cleanouts for landlords, estates, and pre-sale prep

Demo done the careful way

When mold is part of the job, demolition is not just swinging hammers. Affected areas come out under containment so spores and dust don’t spread through the house, debris is bagged and hauled by our own crew, and what’s behind the walls gets inspected while it’s open — that’s when hidden rot and leaks show themselves. Then the same company dries, treats, and rebuilds.

On the job

interior demolition Fort Pierce — gutted interior with exposed studs during a rebuild
Gutted to the studs, ready to rebuild
interior demolition — dumpster on site at a Florida home during demolition
Demo day: dumpster on site, debris hauled by us
water damage rebuild — new drywall going up after demolition and drying
After demo: the rebuild begins

Frequently asked questions

What does interior demolition include?

Taking out the damaged or unwanted parts of a room — tile, tubs, vanities, cabinets, counters, drywall, and flooring — down to the structure, with debris hauled away. On mold jobs, the tear-out happens under containment so spores don’t spread to the rest of the house.

Do you haul the debris away?

Yes. Debris removal is part of the job — we bring the dumpster, load it, and haul it ourselves. You don’t coordinate a separate hauler.

Is demolition done before mold remediation?

They are the same visit, in the right order: containment first, then the affected material comes out as part of remediation, the structure is dried and treated, and only then does the rebuild start.

How long does a gut-out take?

A single bathroom or kitchen gut-out is often a day or two; whole-room or multi-room tear-outs take longer. We give you a schedule in writing before we start.

Mold or water damage? We answer 24 hours.

Call 772-GOT-MOLD Book an inspection